+91 95961 18035 · contact@telkoindia.com · Srinagar, J&K & Sharjah, UAE
GSTIN 01FCYPM9726E1Z5 WhatsApp
Request a proposal

Division 03 · Transformer oil filtration

Transformer oil, restored on site

A transformer is only as reliable as the oil that cools and insulates it. Over time, moisture, acidity and particulates turn that liquid into a liability. Our multi-stage high-vacuum process restores dielectric strength — without the cost, downtime and environmental burden of a full oil replacement.

Process
High-vacuum · heated · micron
Verification
BDV & moisture, logged
Location
On your site, closed loop
Coverage
All districts of J&K

Capabilities

What the process actually removes

01

High-vacuum degassing

Removes dissolved gases and moisture, preventing internal arcing and partial discharge.

02

Micron-level filtration

Eliminates microscopic sludge and metallic particles that erode insulation.

03

Heated dehydration

Drives bound moisture out of the oil at controlled temperature, restoring insulation performance.

04

On-site processing

Minimal downtime — we bring the rig, the operators and the test equipment to your substation.

05

Documented testing

BDV and moisture readings logged before and after, handed over with the completion report.

06

Life extension

Adds years — often decades — to the service life of transformers, OLTCs and oil-filled switchgear.

Typical field results

The numbers we hand over

Every pass is verified. Figures below are representative of a contaminated distribution transformer restored to service; your completion report carries your own readings, not these.

Breakdown voltage
28 kV65 kV
Moisture content
35 ppm8 ppm
Dissolved gas
8%<1%

Method

A closed loop — no oil leaves your site

Oil is drawn from the transformer, processed through six stages, tested, and recirculated. Passes repeat until the target BDV is reached, then the oil is returned.

01

Intake

Oil drawn from the transformer under controlled flow.

02

Coarse filter

Sludge and visible particulates removed first.

03

Heating

Controlled temperature, held at or below 65 °C.

04

Vacuum chamber

Degassing and dehydration under high vacuum.

05

Fine filter

Micron-level polish before return.

06

BDV test

Dielectric strength measured and logged each pass.

Recirculation continues until the target breakdown voltage is reached, after which the oil is returned to the transformer. The loop stays closed throughout — nothing is decanted, transported or disposed of off site.

Plant engineering

Building the filtration plant, not just operating one

Where a utility, manufacturer or oil trader needs its own pre-treatment capability, we design and build it rather than hiring out ours indefinitely.

Plant design

Tank and heater sizing, pump and vacuum selection, control system architecture and the safety interlocks that keep an operator away from hot oil under vacuum.

Fabrication & commissioning

In-house fabrication through to a commissioned, tested plant — including instrumentation, control panel and the acceptance run that proves it meets specification.

Operator training

Documented operating procedures and hands-on training, so your own staff can run the plant safely and interpret the test results it produces.

Questions

Oil filtration, answered straight

Why filter the oil instead of simply replacing it?

Three reasons. Cost — filtration is a fraction of the price of new oil at transformer volumes. Environment — used transformer oil is a hazardous waste, and filtering avoids generating it. Downtime — on-site processing takes the transformer out of service for far less time than a drain, flush and refill.

How do you prove the work succeeded?

Breakdown voltage and moisture content are measured before we start and after each pass, using test equipment brought to your site. Those readings are logged and handed over in the completion report. If the target BDV is not reached, the oil goes round again.

How long will our transformer be out of service?

It depends on oil volume and how contaminated it is, which is why we survey before quoting. The schedule is agreed with your electrical team in advance and worked around your load profile — including overnight and weekend working where the outage window demands it.

Which areas do you cover?

Srinagar and all districts of Jammu & Kashmir. The equipment is mobile, so remote substations are reachable; additional logistics for high-altitude or difficult-access sites are quoted openly rather than hidden in the rate.

Can you also test oil without filtering it?

Yes. Condition monitoring — BDV and moisture testing on a scheduled basis — is available as part of an annual maintenance contract, so filtration is carried out when the readings call for it rather than on a guess.

Tell us what needs building.

Send a drawing, a site address or a one-line brief. An engineer — not a call centre — reads every enquiry and replies with a scope and a number.